USB A to USB C Cable 33ft,10Gbps High Speed Fiber Optic Type A to Type C Cable,Compatible with Cameras,Webcams,Projectors,VR/AR,Hubs,HDDs
$86.00
Price: $86.00
(as of Aug 25, 2025 01:08:33 UTC – Details)
Product description
Add to Cart
Add to Cart
Add to Cart
Add to Cart
Customer Reviews
4.2 out of 5 stars 14
4.2 out of 5 stars 14
4.2 out of 5 stars 14
4.2 out of 5 stars 14
Price
$92.88$92.88 $83.00$83.00 $82.00$82.00 $86.00$86.00
Connector Shell
Zinc alloy shell Zinc alloy shell Zinc alloy shell Zinc alloy shell
Data Transmission Rate
10gbps 10gbps 10gbps 10gbps
Protocol Standard
USB 3.2 Gen2 USB 3.2 Gen2 USB 3.2 Gen2 USB 3.2 Gen2
One-Way Transmission
✓
✓
✓
✓
Package Dimensions : 8 x 7 x 1 inches; 1 Pounds
Date First Available : April 19, 2025
Manufacturer : ZZPN
ASIN : B0F5MGSYQ8
Best Sellers Rank: #67,388 in USB Cables
Customer Reviews: 4.2 4.2 out of 5 stars 14 ratings var dpAcrHasRegisteredArcLinkClickAction; P.when(‘A’, ‘ready’).execute(function(A) { if (dpAcrHasRegisteredArcLinkClickAction !== true) { dpAcrHasRegisteredArcLinkClickAction = true; A.declarative( ‘acrLink-click-metrics’, ‘click’, { “allowLinkDefault”: true }, function (event) { if (window.ue) { ue.count(“acrLinkClickCount”, (ue.count(“acrLinkClickCount”) || 0) + 1); } } ); } }); P.when(‘A’, ‘cf’).execute(function(A) { A.declarative(‘acrStarsLink-click-metrics’, ‘click’, { “allowLinkDefault” : true }, function(event){ if(window.ue) { ue.count(“acrStarsLinkWithPopoverClickCount”, (ue.count(“acrStarsLinkWithPopoverClickCount”) || 0) + 1); } }); });
[Zero Data Loss & 10Gbps Fiber Optic Speed] Achieve flawless 10Gbps data transfer with our fiber optic USB C cable, engineered for zero signal degradation even at 50ft. Ideal for VR gaming, 4K streaming, and industrial systems, its optical core eliminates electromagnetic interference (EMI) and outperforms traditional copper USB C cables.
[Military-Grade Durability, Ultra-Slim Flexibility] Featuring a Kevlar-reinforced fiber core and 24K gold-plated connectors, Its 0.16in slim design snakes effortlessly through tight spaces while ensuring corrosion-free, high-speed connectivity.
[Universal Plug-and-Play Compatibility] Seamlessly connect USB-C devices like Barco ClickShare, 4K cameras, and Microsoft Azure systems. Backward-compatible with USB 3.2/3.1/2.0, this fiber optic USB C cable works instantly—no drivers or adapters needed for gaming, conferencing, or data centers.
[Secure One-Way Data Transmission] Designed for critical setups, our optical USB C cable enables secure host-to-peripheral connectivity (PCs to VR headsets, medical devices, or HDDs).
[Industrial-Grade Reliability + Lifetime Support] Built with zinc alloy shielding for heat/EMI resistance, this USB C optical cable is backed by lifetime customer support
User Reviews
Be the first to review “USB A to USB C Cable 33ft,10Gbps High Speed Fiber Optic Type A to Type C Cable,Compatible with Cameras,Webcams,Projectors,VR/AR,Hubs,HDDs”

$86.00
There are no reviews yet.